The architectural design of this project included programming, space planning, and exterior design for various shops, vehicle parking, vehicle service bays and offices for the maintenance building. In the corporate center, EAPC performed space planning, interior design, exterior envelope design, and office layouts. EAPC worked closely with Minnkota Power Cooperative's staff to determine current and future space needs. An in-depth study of existing facilities and the use of current space was performed in order to find inefficiencies and potential ways to improve them. The new campus brings all of Minnkota's Grand Forks employees and equipment together in one place. Complex security and efficiency were of great importance in the planning process as well as planning for future growth. The Campus features a 78, 000 SF corporate office; 58, 000 SF electrical operations facility; 28, 000 SF warehouse; and detached 89, 000 SF Large equipment and maintenance facility. Each space was designed to allow for future expansion.
0L VARIABLE VALVE TIMING V8 SFI E85-COMPATIBLE FLEXFUEL Auto 6-Spd HD Overdrive $23, 995 Color: Silver Streak Metallic $21, 995 Color: Barcelona Red Metallic Load Next Page Disclaimer: This is a guide only. See salesperson for additional information. All vehicles subject to prior sale. The dealership, nor ProMax assume any responsibility for the accuracy of the values, sale price, rebate(s), interest rates, terms, monthly payment, equipment, mileage, or for any errors or omissions of the dealership, or ProMax Please verify all information for accuracy prior to purchase.